Products
UNOGASSM
WATER-CUT® Process for Water Shut-off in Gas Wells
View PDF
UNOGASSM is a patented strategy for placement of gelled polymer into the gas producing zone to shut off water flow without hindering gas production. Long term water control is possible, thus allowing previously suspended well, due to water loading, to once again flow gas. Case history studies show that successful water control can continue longer than three years.
The UNOGAS gel polymer chemistry system is selected to meet the individual well’s down-hole environment, which is usually dictated by bottomhole temperatures. TIORCO’s polymer and crosslinking reagent systems are capable of producing stable, long lasting gels in temperature regimes exceeding 300°F or 150°C.
A special gel-alternating-gas placement method selectively places the polymer gel into the high water permeability zones and generates gas flow channels needed for gas production. TIORCO’s reservoir engineers study individual well production history to determine the proper chemical formula, treatment size, and placement method.
UNOGAS polymer solutions should be prepared using the POL E DUCTM dry polymer preparation technology to ensure proper dispersion and hydration of the high molecular weight polymer. The solution can be pumped using typical oil field chemical and additive pump trucks. Nitrogen pumping equipment is required for the alternating gas slug stages.
For high temperature applications above 255°F (124°C), the UNOGELSM controllable gelation system is used. UNOGEL gels exhibit a robust, long life, and can be placed in the presence of H2S, CO2 and into a wide range of pH environments.
UNOGASSM
Polymers
WATER-CUT® 100
WATER-CUT® 204
WATER-CUT® 210C
Crosslinkers
WATER-CUT® 644
WATER-CUT® 684
Stabilizer
WATER-CUT® 646 |